Maintenance and drydocking

Plan the year. Master the dock.

A planned maintenance system keeps every job on time. Drydock superintendence and riding repair squads keep the hull, machinery and Class surveys on schedule.

Merchant ship raised on blocks in a floodlit dry dock at dusk
PMSplanned maintenance
Dry-docksuperintendence
Ridingrepair squads

Interactive · PMS schedule board

Switch jobs on and watch the year fill.

An illustration of how a planned maintenance schedule is built. Toggle a job to place it in the calendar.

JobJFMAMJJASOND
0 jobs scheduled000000000000

01 · Why PMS

A schedule is a promise kept

Planned maintenance puts every recurring job on a calendar by running hours or interval, and records it for Class. It is a core part of Nanak technical ship management.

  • Jobs never rely on memory
  • Records ready for surveys
  • Spares ordered before jobs fall due

Technical management →

Ship engineer overhauling a centrifugal pump in an engine room workshop
Engine room overhaul

Interactive · Drydock timeline scrubber

Drag the gate through a drydocking.

Specification desk with laptop and binder
Surveyor inspecting a vessel with a clipboard
Merchant ship raised on blocks in a dry dock
Inspector examining welded frames in a ballast tank
Worker hydro-blasting a ship hull in dry dock
Bronze ship propeller in a dry dock
Engineers inspecting overhauled turbocharger parts
Stern of a merchant ship at the quay at golden hour

Phase 1 of 8

Specification

The superintendent builds the work list from planned maintenance history, open defects and Class requirements, so the yard prices a clear scope.

Watch point Is every defect and survey item in the specification before it goes out?

A general sequence for explanation only. Each drydocking is planned to its own vessel, yard and Class requirements.

02 · In the dock

Three views of a drydocking

Worker hydro-blasting a ship hull in a dry dock
Hull treatmentBlasting and coating to the specification.
Large bronze ship propeller in a dry dock with workers for scale
Running gearPropeller, rudder and sea valves checked.
Inspector with a head torch examining frames inside a ballast tank
Tank surveySteel gauged and tanks inspected.

04 · Docking checklist

Five questions before the vessel arrives

  1. 01

    Scope

    Is the work list complete and priced like for like?

  2. 02

    Class

    Are surveys booked and certificates checked?

  3. 03

    Spares

    Are long-lead items ordered and tracked?

  4. 04

    Labour

    Are welders, fitters and electricians planned?

  5. 05

    Report

    Who writes the close-out and updates the plan?

Merchant ship raised on blocks in a floodlit dry dock at dusk

05 · The yard visit

Time in dock is the most expensive time a ship spends. Plan it well.

06 · Enquiry builder

Plan a maintenance or dock job

Vessel type

Work

Nanak group services

The Nanak group: ship management, training and careers

07 · FAQ

Maintenance and docking questions

Open a line to read the answer.

A planned maintenance system schedules every recurring job on a vessel by running hours or calendar interval, so work is done on time and recorded for Class. It is a core part of the technical management service from Nanak Ship Management, and our board on this page shows how a schedule fills a year.

Drydocking starts with a specification built from maintenance history, defects and Class needs, followed by yard quotes, supervised docking, surveys and a close-out report. Nanak Ship Management lists dry-dock superintendence in its services overview, and our scrubber on this page walks through the phases.

Yes. Dry-dock superintendence is a published service of Nanak Ship Management, meaning an experienced marine professional represents the owner in the yard through the work. Details are on the Nanak services page, and you can ask how attendance is arranged for your vessel.

Often yes. Nanak Ship Management offers riding repair squads, certified teams that board at anchor or en route to carry out repairs without a yard visit. The services page describes the squads, and the team can advise what suits the defect.

Yes. The group supplies certified electricians, 6G, TIG and MIG welders, structural fitters and skilled helpers for yards and vessels. See the international labour supply service for trades, and share your headcount and dates to plan a squad.

Yes, as part of technical management the team reviews Class survey dates, hull condition and commercial plans to propose a docking window. Ask the Nanak Ship Management operations team for a view on your vessel, and we shape a specification to match it.

Get in touch

Step through the gate

Tell us the vessel, the work and the timing. A marine professional replies, not a sales script.